Misamis Oriental  
 
   
Custom Search
 
 
Webmaster's comment Webmaster's comment

External site External site
 
NOTICE TO THE PUBLIC
Maricar Uy of Bulua, Cagayan de Oro
Ms. Maria Carmela Ybañez Uy or Maricar Uy stopped working with Nazca Designs in August 2009. Any financial transaction of Maricar Uy is hers alone and does not represent Nazca Designs.

 
Infrastructure
Roads and Bridges
 

The total road network of Misamis Oriental -- including Cagayan de Oro -- already reached 927 kilometers. This includes the 210-kilometer all-weather, two-lane highway connecting the province to Iligan and Butuan cities. Davao is accessible via Butuan City and the alternative route that passes through Bukidnon.

Road Network (km)
Type Misamis Oriental Cagayan de Oro City Total
Concreted
242.200
176.18747
418.38747
Asphalted
9.930
14.96810
24.89810
Graveled
53.284
412.95758
466.24158
Earth
-
17.57350
17.57350
TOTAL
305.414
621.68665
927.10065
Source: City Engineer's Office and Department of Public Works and Highways-Region 10

Bridges. There are 186 bridges spanning 1,082.35 linear meters in the entire province. Bridges length ranges from 6 to 199 linear meters. By type, the bridges are classified into reinforced concrete deck girder bridge (RCDG), concrete box culvert, spillway, steel, modular steel bridges.

Bridges
Type Number Length in lm Grand Total
 
CDO
MOR
CDO
MOR
Number
Length (lm)
Reinforced Concrete Deck Girder
4
 
139.65
4
139.65
Concrete Box Culvert
78
 
379.92
78
379.92
Footbridge
3
 
147.00
3
147.00
Spillway
2
 
23.00
2
23.00
Steel
4
 
293.39
4
293.39
Modular Steel Bridges
3
 
95.00
3
95.00
Permanent
92
-
4.39
92
4.39
Temporary (timber or lumber)
-
-
-
-
-
TOTAL
94
92
1,077.96
4.39
186
1,082.35

PAGES: Airport | Internet | Land Transportation | Phone | Power | Roads | Seaports 1 2 | Water

 
Main content provided by the Department of Trade and Industry of Misamis Oriental. Photos are copyright properties of Nazca Graphic Design & Photography. Published November 2008.